| Sector: | Healthcare | Business: | Shaylor Construction |
| Client: | Bondcare Group | Form of Contract: | PPC 2000 Rev 03, Partnering Contract with Design |
| Location: | Birmingham | Contact Name: | Mr. Martin Baxter |
| Value: | £5.99million | Contact Telephone: | - |
| Duration: | 43 weeks |
The brick clad, timber framed structure employs offsite manufacturing to reduce programme, promote safe working and provide consistent high quality standards throughout. The accommodation comprises: - 116 bedrooms - 9 day rooms - therapy areas - kitchens - staff rooms - administration areas Offside modular methods mean that construction is carried out on a floor by floor basis with podular bathrooms fully finished and ready for on site service connections. Timber frame cassettes and bathrooms are lifted into position to enable speedy erection. The scheme includes full mechanical and electrical installations, including nurse-call and entry systems. A full external works and landscaping layout was developed to complement the project and the surrounding area. The project is part of a continuing agreement with Bondcare to provide care facilities across the UK.
- Early involvement in the framework enabled consideration of various working methods to provide best value in terms of cost, programme, buildability, quality, safety and environment.
- Considerate Constructors Scheme score 34.5 in November 2009, placing the project in the top 15% of contracts in the UK.
- 10 week programme saving by using timber frame technology and en-suite podular bathrooms, manufactured offsite.
- The name of the facility will be suggested by competitions arranged at local schools by Shaylor Construction, with the winner chosen by Bondcare Ltd.
Charlotte Jeffries will be joining the JDI Team as the new receptionist on Monday 6th September. Please give her the usual JDI/Shaylor welcome.